Indian Railway runs on electricity. This blog is for sharing the well organised knowledge base and issues related to the most important infrastructure of railways- Traction Distribution.

Thursday, November 8, 2012

BM and VCBs in a TSS


Posted by Rajesh Gupta at 9:43 PM 9 comments
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: PSI, Traction Sub Station, TRD, TSS

Two things that are like heart and brain of OHE


What special do you see here?


Posted by Rajesh Gupta at 9:36 PM 2 comments
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: ATD, Cantiliver, Electrification, OHE, TRD
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Indian Railway Electrification

Approx. 40 % of RKM is elctrified which runs 70 % freight traffic of IR. Total fuel bill of IR is Rs.14000 Crore out of which electric traction bill is Rs. 12000 Crore.



Blog Archive

  • ►  2016 (1)
    • ►  July (1)
  • ▼  2012 (2)
    • ▼  November (2)
      • BM and VCBs in a TSS
      • Two things that are like heart and brain of OHE
  • ►  2011 (2)
    • ►  April (2)
  • ►  2010 (4)
    • ►  October (3)
    • ►  September (1)

A picture is worth a thousand words...

Important OHE parameters

Normal height of contact wire at support point :- 5.60 m ( presag of 100 mm ).



Minimum height of contact wire at level crossing : - 5.50 m



Minimum Height of contact wire at overline structure:- 4.92 m Dia of contact wire :- 12.24 mm



Condemned dia of contact wire on main line:- 8.25 mm



Condemned dia of contact wire at loop lines/yard:- 8.00 mm



Stagger of contact wire on tangent track :- +- 200 mm



Stagger of contact wire on curved track :- +- 300 mm



Stagger of catenary on tangent track at support for single cantilever :- 0



Gap between two parallel running contact wires at uninsulated overlap :- 200 mm



Gap between parallel running contact wires:- 500 mm



Height of contact wire of turnout OHE above contact wire of the main line:- 5 cm



Track separationa at turnout and cross overat the location of obligatory structure:-150-700mm.



Minnimum implantion at obligatory structure/mast supporting more than one OHE:-3.



Normal implantation(standard):-2.50m. +, -0.03



Minimum implantation (critical) withCEE approval. :- 2.36m.



Minimum implation on platform : 4.75 m.



Normal encumbrance :-1.4 m.for72m. span



Maximum permisible slope of contact wire on main line:-3mm./mtr.



Maximum permissible slope of contact wire in yards.:-5mm./mtr.



Short time min.vertical electricl clearance:- 270mm.



Short time min. Hozrizontal electrical clearance :- 220mm



Long time min. horizontal eletrical clearance.:- 320mm.



Stagger of contract wire at PTFE neutralsection at support:-0.



Earthing resistance of FOB/ROB/Girders/Bridge/Platform shed & other overlinestructures:-10



Cross section area and length of C jumper wire:-50mm 1.7m.



Cross section and length of F jumper wire :-50mm, 1.6m



Cross section area and length of G jumper wire:-105mm, 3.5m.



Distance of G jumper from obligatory mast towards overlap side-5.6m.



Fixed length of the dropper wire:- 105mm.



The distance of the first dropperfrom support:-2.25m.



Swept zone clearance of section insulator at trailing side:-1.726m



Swept zone clearance of section insulator at facing side:-1.60m



For the section insulator, thedistance between contact wire and runner oneitherside shouldnot be less than:-220mm



Maximum tension length for regulated OHE:-1500



Normal sag of regulated OHE:-100mm.



Maximum span length on tangent track for regulated OHE:-2000m.



ZY valueof winch type ATD at half tension length(750m) at35 c in mm.:-Z =1250, Y =2500



XY value of 3 pulley type ATD at half tension length (750 m.) at 35 c in mm. :- X=750, Y= 2500



The difference in length of adjacent spans on mian line should not bemore than:- 18m



Minimum length of dropper in the span:- 150mm.



In case of overlap type turnout, the turnoutspan should be less than or equal to :- 54m.



With crossed type equipment with actual crossings of OHEs at facing turnouts, the anchor span should be restricted to :- 54 m.



Leaning of mast should be attended if leaning at tope exceeds:- 15 cm.

Followers

Some Civil Engineering

TRD officers deal with foundations a lot. Some tips:-

GAD:- General arrangement drawing. It contains PLAN and ELEVATION ( of cross section ) . It contains tentative dimensions.

Structural design:- it for two types:- Load Bearing Structures and Framed Structures ( Combination of columns and beams )

Key Plan:- Roof level ( RB ) , Floor beam ( FB ) and Plinth Beam ( PB )

Schedules of column, beam , slab and footing .

What is M-25 ? It represnts the crushing strength of the Mix ( M stands for mixed ) . Unit is N/square meter. It is measured after 28 days of casting.

What is 1 :2:4 ? It is ratio of Cement, Sand and Aggregate

Components of RCC :- Sheer stirrups ( main reinforcement ), Tie Reinforcement , Clear Cover ( for durability )

What we mean by Bottom Steel 2/16 :- it means 2 nos of 16 mm dia.

Stirrups are usually of 8 mm dia with 100 C/E.

TRD links

  • IRIEEN OHE publication
  • Vasai Road Substation
  • ACTM-I
  • ACTM-II ( Part-1 )
  • ACTM-II ( Part- 2 )
  • RE directorate, RB
  • Blog about tariff, VRLA Batteries etc

S.O.D

Sod

About Me

My photo
Rajesh Gupta
View my complete profile

Subscribe To

Posts
Atom
Posts
All Comments
Atom
All Comments
Powered by Blogger.

Total Pageviews